Kitchen renovation week ?

October 10, 2011

Two weeks ago our contractor patched the drywall edges and screw holes.

Last week he skim coated and sanded the entire surface of the drywall.  Note that the window trim is still missing at this point.

Alex and I spent all of last weekend sanding and patching the disassembled window and door trim.  Then, this weekend we nailed it all back up, caulked the cracks, and painted from dawn to dusk.  Why we bothered to paint the areas that will be covered with cabinets and tile, I can hardly say.  We must be insane.

Now for the floors.  The “floor guy” is working on those repairs this week, after which the poly coating will need a week to dry.   Then, finally, cabinets can be installed.  Fingers crossed; maybe this project will be finished before Thanksgiving.

Advertisements
No comments yet

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: